I finish up the 6R80 build and summarize.
Along the way, I show final assembly of the 'front drum complex', which consists of the forward and overdrive drums, overdrive clutch hub/intermediate shaft and forward clutch hub, all held in place by the direct clutch and snap ring.
I then move into the low reverse clutch pack clearance measurement and adjustment process. From there I install everything into the case for the final time and perform a front end play check and adjustment.
Lastly, I bolt the control body assembly onto the case, finishing up with the filter and pan/gasket.
You can skip around per the chapters below: