Both areas completed with Marshalls products
The driveway was in Metro block now discontinued.
The back in Arrento silver 600x600 with a charcoal border the client supplied, not sure where they were from.
Blades I use are from Elite Stone Tools.
The stone we screed is 2/6mm clean limestone.
Hope you enjoy the video
Whole job took 15 days, most of the time 2 men apart from the dig out day and the block laying.
All the best
Matty