Est weight is used for Unit Top-down estimation.
These estimation weights are used to determine how units are distributed among WBS and activities.
In this tutorial, we described in detail that how to use the Est weight in Primavera p6 and how to apply the Top Down Estimation to the WBS, Activities, Labor, Non-Labor, and for the projects.
You can manage the weights for the above all from primavera p6.
Calculate and assign estimated weights from Excel to Primavera P6 | Using Top down Estimation Tips
1. Save print Settings | using Import and Export | Primavera P6 layout Files | Plf | Solutions | Tricks
https://youtu.be/49j-Du87714
2. Update Progress using Activity Steps | Create Template | Performance Percent | Primavera P6 | Tips |
https://youtu.be/0keoRZiVV3k
3. How to Maintain an Activity Change Log | Primavera P6 | UDFs | Activity Steps | Delay log | Hacks
https://youtu.be/YPmw6GhcA38
4. How to set Default Activity IDs numbering | Modify Activity Suffix and Prefix | Primavera P6 | Tip |
https://youtu.be/EHQyz9QabEs
5. How To Renumber Activity IDs For All Activities In An Ascending Order In Primavera P6 | Tips
https://youtu.be/AYU6K1QcYVI
6. How to Change Activity IDs by Export and Import | Primavera P6 Simple Easy and Fast Method | Tips |
https://youtu.be/SCH7pusNMcw
7. Primavera P6 Difference Between Activity Calendar and Resource Calendar | Change Calendar | Tips
https://youtu.be/O4-yRVBuTTM
8. What are activity types relationship and their role in Primavera P6 | Easy Complete Tutorial |
https://youtu.be/_ZBzpEM78Jg
9. Import Project Expense cost in Primavera P6 from Excel file | Load Expense in Project | load Actuals
https://youtu.be/z1ptlGCcK2M
10. Export and Import Primavera P6 Project with Baseline in XML Format | Multi projects in single file |
https://youtu.be/lsS1FFg8Ghs
11. Explained difference Between XML and XER File while Importing and Exporting from Primavera P6
https://youtu.be/yiJrgrc9er8
12. How to Convert WBS to Activity Code in Primavera P6 | Using Excel | Easy Fast Trick | Large Schedule
https://youtu.be/ue-6wVKzJr4
13. Easy Creating WBS and activities in Primavera P6 | Help of Excel and MPP | Import XML and MPX Format
https://youtu.be/VVgWGCkgaik
14. How to Remove Actual from Updated Project in Primavera P6 | Remove Progress | Change Activity Status
https://youtu.be/5iuoLDMbXJA
15. Explain Difference between Delete and Dissolve Activity in Primavera P6
https://youtu.be/tpMNOASYvIk
16. How To Remove Relationships From Multiple Activities In Primavera P6 | Remove Predecessor Successors
https://youtu.be/eEI3vJfVadc
17. What are dangling logic in Project Schedules in Primavera P6 | Resolve dangling logic and Activity |
https://youtu.be/NnWNbcAaSWA
18. How to find or detect lag and dangling logic in Project Schedule of Primavera P6 by using Excel tips
https://youtu.be/NsYA92Mh9gA
19. How to build lookahead in primavera p6 | Lookahead Schedule | Layout | Plan | Filter | Tips Tricks
https://youtu.be/TPHe6oDYaxg
20. How to Highlight Activities Using Filters And Spotlight Feature In Primavera P6 | Tips and Tricks
https://youtu.be/G9h9jG81W7I
21. How to fix Log File Can't Be Created Error in Primavera P6 during Scheduling | Problem Solution |
https://youtu.be/Xx1AwPrcl08
22. How to Change Password in Primavera P6 | Recover Password | Reset Password | Tips and Tricks | SQL
https://youtu.be/Up7kfH02z5U
23. How to Assign or to Remove Multiple Resources From Multiple or all Activities in Primavera P6 | Tips
https://youtu.be/4xJ128d_riU
24. Difference Between Retained logic and Progress Override in Primavera P6 | Progress Update | schedule
https://youtu.be/IMuEOk6Y3JU
25. How to Track Find Detect Out of sequence Activities in Primavera P6 | Filter | Schedule log | Tips
https://youtu.be/cs7RKN5QzpI
26. How to Create Custom Selection of Activities by using Filter to Print in Primavera P6 | Tips Tricks
https://youtu.be/DsQd4ALDHJY
27. Print or display Highlighted Activities Gantt Chart different bars by apply Filter in Primavera P6
https://youtu.be/fY3J9F-xoeM
28. Suspend and resume activity in Primavera P6 adding delay events for Extension of Time | Tips tricks
https://youtu.be/GSxhVyBpaMs