More progress is made on the Coal Merchants Yard with the addition of workshop roofs, coal loads in the staithes, gates on the vehicle entrance and some surgery to the pavement to add in a dropped kerb for the yard entrance.
0:00 Introduction
3:07 Dropped kerb vehicle entrance
7:10 Workshop roof structures
17:23 Loading up the coal staithes
21:10 Vehicle entrance gates
22:25 Wrap-up