DeWalt Circular Saw: https://amzn.to/3APiHMn
DeWalt Electric Framing Nailer: https://amzn.to/3Ao8oyn
DeWalt Electric Brad Nailer: https://amzn.to/30c4aO7
Drill: https://amzn.to/39cXP6c
Crowbar: https://amzn.to/3C0h931
Large Sledgehammer: https://amzn.to/3kdRNsf
Small Sledgehammer: https://amzn.to/3Ekdnnf
Utility Knife: https://amzn.to/2XbZu9h
This week, we frame out the hole for the new staircase! We start by removing the subfloor, then cutting out the floor joists that we no longer need. Build 2 double headers to flank the hole and install those headers with joist hangers. We then install one more double header on the far side of the hole to finish the process. This is quite a labor intensive process but was very rewarding!