MENU

Fun & Interesting

How does it work: Stevtensioning

Delmar Systems 376,684 lượt xem 6 years ago
Video Not Working? Fix It Now

STEVTENSIONER®
Enabling installations

The proof loading of a permanent mooring system for CALM buoys and FPSOs is critical for a system’s certification. The proof loads are typically 80-100% of the design load so that substantial bollard pull capacity is required. The use of the STEVTENSIONER® for subsea tensioning offers significant cost benefits as it reduces the required load by typically 60%. As a result mooring installations can be performed from modest anchor handlers or crane barges.

More information:
https://vryhof.com/products/installation-equipment/stevtensioner/

video by: DOCK90 I maritime & offshore communication partner
https://dock90.com

Comment