00:00 Arriving at the garage
00:10 Looking at the new industrial garage door
02:45 Installing a heat fan
04:40 New day
04:46 Fault searching for malfunctioning Upright TM12 lift
11:05 Starting to install inner metal wall sheeting
15:55 Done for the day
16:49 Leaving the motor with the repair guy and buying kebab pizza
17:12 Installing anchors for the coming lights
19:00 Putting up more wall sheeting
22:31 Installing an electric door lock
26:20 Installing an electric duct fan
27:29 Measuring the temperature difference from the floor to the roof with a thermal camera
27:54 Installing an electric channel fan
28:20 Adjusting the garage door and installing remotes for it
30:26 Time lapse of stars and northern lights
31:02 Last of the wall sheeting and extra insulation going up
34:32 Installing the outer trims for the building and the electric garage door box
37:21 Taking the tracked Can-Am to go search for an electric motor at the stone crusher site
43:07 Trying the new motor to see if it fits
45:13 Installing floor heating hoses onto the underfloor heating distributor
52:49 Checking the heat difference again after the duct fan installation
53:15 Talking about upcoming metal trims
54:15 Ending drone shoot