We are still working on the logging line above the main layout. Making log ties, a small bridge, and roadbed. AND Steve is getting the Chama sand house together at the locomotive shops on the lower line.
It's been a challenging week. Hard to get past the news, but also hard to figure out how to make and mount log ties. Steve built the original section of the logging railroad using log ties and code 148 rail. We want to match the ties, but we will also need to relay all the rail with code 215 to clear the .166 flanges on our 5 logging locomotives.