THE RIG MOVE OPERATION started from picking up rig's tow line, Connected tow line ,rig ready to tow,Rig under tow, rig at soft pin position, rig approaching final position,rig at final position(in position) ,Rig on Preloading, Shortening tow wire ,cleaning vessel's tow wire, Disconnected tow line and transferring rig's tow line.vessel was on DP while was connecting ,disconnecting and during preloading.Please watch till the end of THE RIG MOVE OPERATION. #rigmove #DP #Dynamicpositioning #DP2 #AHTS #vessel #offshore #Rigmoveoperation #operation #towing #shortening #payout #wire #towingwire #softpin #softpinposition #preload #finalposition #rig #connected #disconnected