Here is our process when it comes to installing a flagstone patio.
Step 1: Determine height, size and shape of desired patio.
Step 2: Mark out area approximately 1 foot larger than desired patio.
Step 3: Remove grass and soil as needed to reach height of subgrade.
Step 4: Install geotextile fabric as needed.
Step 5: Install sub-base gravel is applicable.
Step 6: Install base gravel.
Step 7: Install bedding gravel.
Step 8: Install flagstone, starting with largest pieces.
Step 9: Fit smaller flagstone in between stones, cut and trim as necessary.
Step 10: Clean patio and install joint sand or other material.
Step 11: Clean the work area, pat yourself on the back take a picture.
Step 12: Grab some family and friend to enjoy your new flagstone patio.
0:00 Introduction to Flagstone Patio
0:28 The Subgrade
3:10 Stone Subbase Layer
4:14 Geotextile Fabric
6:45 Compacting
7:01 Stone Base Layer
10:05 Stone Bedding Layer
12:24 Laying Flagstone
19:08 Sand
19:39 Tapping
19:57 Blow Clean and Wet Down
20:22 Review and Conclusion