This segment shows the final completion of the upper truss assembly up through it being primed and ready for final paint and weathering. There is a clip showing how a conduit run was added on the outside of the bridge, as this was an interested detail I wanted to include.
And of course there were issues! During installation of the diagonal braces it was noticed that several were not long enough- either that or (more likely) the bridge was off somewhere. So, a fix was implemented that got the work back on track.
Up in Part 6 will be the conclusion of the build series- final assembly of upper truss to floor and installation on the layout!