In the previous video we started construction on this compact HO scale layout and managed to get the basic track work complete. Here in part two the goal was to begin laying the foundation for all the scenery.
This meant building cardboard structures for all the mountains and buildings as well as designing a road which weaves its way through the centre of the layout.
Some testing was also done with a HO big boi to ensure the new scenery didn't mess with the track work. Impressibly the locomotive was able to run even on the inside circuit with tight turns and hills.